Hallelujah is undergoing a major upgrade of the interior. Water was allowed to settle in the boat during winter storage. Hallelujah had been stored for 22 months under shrinkwrap.
There are some varnishing and woodworking repairs that are being done.
|
|
Repairs being undertaken:
1. Interior strip and revarnish.
Floorboards were revarnished in a high gloss, but rest of interior floor is in a mat. Remaining interior needs to be stripped and revarnished.
2. Bulkhead and wood floor board supports under floorboards are suffering from water left in boat during winter storage. They are being repaired and replaced.
3. Windows need to be recaulked and varnish on port side fixed.
4. Wood step around top of mast needs to be replaced.
5. Mast needs electrical work done.
|
|